Power Generation Boiler Maintenance Access Solutions
Product
Overview (back
to top)
Our engineering design team, equipped with the
latest computer aided design technology and over
40 years of experience have developed a simple,
cost effective boiler maintenance access system
for power plants that is the fastest, safest, boiler
scaffolding solution in the world.
The Quick Erect
Boiler Access System offers
| • |
SIGNIFICANT
Revenue Earnings AND FIXED COST SAVINGS |
| • |
FASTER
Accessibility AND A SAFER ALL ACCESS WORK ENVIRONMENT |
| • |
SIMPLE
INSTALATION WITH A Lightweight, High Strength,
flexible PRODUCT |
| • |
Worldwide
Back-up Support AND A 5 YEAR WARRANTY |
By looking at the access requirements
of boiler maintenance we have developed a world-class
solution tailored to an individual client’s needs
and requirements.
Versatility of Product and years
of experience have produced the perfect solution
for Boiler Scaffold Access Systems from Instant UpRight.
With our quality of design and manufacturing, our
systems offer more than traditional scaffolding,
saving both labour and downtime.
Instant Quick-Erect
Boiler Access Systems are erected using a combination
of two Instant Upright basic components, Snap
Out and Spandeck.
Market & User
Types (back
to top)
The Instant Boiler Maintenance Access System is
tried, tested and trusted with worldwide recognition….
The
Instant Quick Erect Boiler Access System has justifiably
achieved recognition throughout the world’s Power
Generation plants and has been supplied to no less
than 80 Power stations worldwide including Korea,
Taiwan, China, Germany, Italy, Hungary, Philippines,
India, Malaysia and Australia.
Our first 500 Mega
Watt system supplied to Korea in 1988 is still
in full use with no deterioration.
Recent
Projects (back
to top)
Manjung
Thermal Power Plant
The new facility has three identical 700MW coal-burning boilers and in November
2007 a new Instant boiler access system was commissioned on site… Full
Story…
Click
here for more projects...
Why
Choose Instant Boiler Access System (back
to top)
Cuts Boiler Downtime by up to one-third giving you
substantial savings in time and money…how?
| • |
It’s
lightweight high strength aluminium construction
means it weighs as little as one fifth
of an equivalent steel system |
| • |
It saves you time and money through
reduced fixed costs and downtime is reduced
by one-third |
| • |
It’s
Fast, Simple and Safe to install with no
tools or welding required. A 500MW
boiler installation can be completed
in just 30 hours |
| • |
Aluminium
is highly durable, it’s non
corrosive, lasts longer and
requires no special cleaning or maintenance |
| • |
It’s Design,
Engineered and Manufactured by the same company so
you know it is right first time,
fits the purpose and the expertise is on hand
from the beginning through to installation |
| • |
A
Service and Support package extends worldwide
and every system wherever you are in the world
is supported by Instant UpRight’s team of Engineer
Specialists |
| • |
Quick
Erect Boiler Access Systems are guaranteed
for a full five years giving you unbeatable
product quality |
Click
here to download all brochures pdf’s
in your local languages