Snap Out
A unique designed Snap-Out offers
an unbeatable solution to access within enclosed or awkward
to enter areas, such as the inside of a power station
boilers, underground chambers and large storage vessels
tank where it would be difficult or impossible to enter
with regular scaffold side frames.
A complete ‘level’ of scaffold neatly
folds into an easily managed bundle which will pass through
an aperture of 36cm’s. Once
it is in the work location, the bundle unfolds to form
a complete scaffold – only the platform needs to be added.
Further levels are handled
in exactly the same manner, building a tower to the
height required. This unique
folding design results in no loose components which prevent
loss and mis-assembly. Structures for special application
can be built using components from the Span 300/400 range.
Snap Out is rated to Load Class 3 and
complies with EN1004
Work at Heights Directive.
Click
here to download all brochures pdf’s
in your local languages
